About the company

Rollmex is a contracting company from Gdynia. Since 1989 we have fabricated, installed and overhauled steel structures and equipment for the power, port and process industries.

The core of the company is an experienced team of supervisors and quality controllers, foremen, welders and fitters.

Our longest-serving people worked on the construction of the nuclear power plant in Żarnowiec, on the four 180 MW units of the Żarnowiec Pumped Storage Power Plant and in the four reactor buildings of the Paks Nuclear Power Plant in Hungary.

We specialise in prefabrication of steel structures, pipelines, tanks and silos in carbon and stainless steel. We build, overhaul and modernise power boilers, boiler auxiliaries and fuel installations. Assembly is led by site managers with construction licences, and our crews hold energy-sector qualification certificates.

As a general contractor we carry out mechanical, civil, electrical and I&C works, together with design and permits.

Since 2009 we have also made port crane components – trolleys, machinery rooms, stairs and auxiliary structures – mainly for Konecranes. We have delivered them to terminals in Hamburg, New York, Oslo, Helsinki and Klaipėda, among others.

Facilities

Our facility at Hutnicza 20B in Gdynia.

paved yard
approx. 4,500 m²
production hall with a 10 t crane
1,000 m²
gantry cranes
2 × 5 t
of structures a year
approx. 1,200 t
Workshops
machining of metals, insulation workshop
CNC cutting
plasma and flame, 2 × 6 m table
Corrosion protection
shelter for blasting and painting
Facilities
warehouse and staff facilities

Milestones

  1. 1989

    Start of operations in Gdynia.

  2. 2001

    ISO 9001:2000 certificate issued by Germanischer Lloyd.

  3. 2004

    As general contractor: a turnkey fuel station for heavy equipment and locomotives at the Gdynia CHP plant, and the gallery linking the terminal with the ferries at the Ferry Terminal in Gdynia.

  4. 2008

    Biomass feeding installation for OP-230 boilers at the Gdynia CHP plant.

  5. 2008–2011

    In a consortium with Chemadex and Energomar-Nord: adaptation of the Gdańsk and Gdynia CHP plants to landfill-free operation.

  6. 2009

    Start in the port crane market – 14 projects to date, mainly for Konecranes.

  7. 2014–2018

    Elements of thermal waste treatment plants in Bydgoszcz, Szczecin and Rzeszów.

  8. 2015

    Certification of factory production control to PN-EN 1090 and of the integrated environmental and OHS management system.

  9. 2016–2017

    Ash removal installation of the new 1000 MW unit at the Kozienice Power Plant.

Request a quotation

Send drawings, a specification or a description of the task. Quotation requests and technical matters are handled by the production department.